Honestly was not expecting to post snow pictures at this point in your construction blog.
Author: dreaminofobx
October 25–Bricks
October 24–Paint
The painters have been working the past couple of days. Unfortunately, they’ve also installed the door from the garage into the house, and it is locked. I will have to get a key so I can keep checking on progress inside. I also saw Action trucks, so I think they’ve been working on installing your HVAC system.

October 20–Orange peel
October 18–Bricks, bricks, baby
October 13–Joints Taped, Gas Line In
All the drywall joints are taped and screw holes are patched.
The gas line was also run, from the street to a stub at the foundation along the right side of the house.
October 12–Fixed!
The pocket door on the half bath upstairs has been pulled out and reinstalled so that it opens on the correct side. Drywall will be repaired when the crew comes in later. To confirm, there are just three switches inside the bathroom, and a light switch was put inside the attic space when the access door was relocated to the opposite side of the bonus room.