Outside, the gutters have been put up. Rain chains will be installed later.

On the inside, error correction in the guest bath. The short, stumpy shower arm has been replaced by the longer one you provided.
The heated towel bar is finally up!!!

The vent hood, range, microwave, and dishwasher are all in. I’m guessing the installer needs a second pair of hands to heft the oven up into its spot in the wall.
Wire shelving is complete in guest bedroom, coat closet, and linen closet.