Outside, your driveway has been graded and prepped for concrete to be poured.
Inside, the plumbers have been hard at work. All of your toilets have been relocated to their proper locations. The shower head with the extender has been installed (it does not appear to extend very much).
They have also installed the tankless water heater in the garage (vent pipes and gas line not yet hooked up).