The master shower is all finished. There is a nice outward slope to the back cubby and the bench. The front cubby ended up just about level.
Wood floors have been installed. They are mostly covered and protected, but you can get a peek at them in the pantry and along the back wall of the kitchen where shelves/cabinets will be installed.