Returned from a week in VA to find much progress outside.
Right side siding complete
Board and batten above garage
Back siding complete
Porch siding and ceiling complete
Left side siding almost done
Crawl space door installed
With tropical storm remnants from Harvey and Irma passing through, it’s been pretty rainy for nearly 10 days. There is still water seeping into the crawl space, but gutter installation should solve this problem.

Meanwhile, on the inside, insulation is complete.
Garage ceiling
Wall between garage and laundry room
Close-up of insulation
Framing/insulation around vent stack in laundry room
Sunroom
Interior master bath wall insulated as requested
Upstairs half bath
Extra roof sheathing removed in attic as promised by Chris
Bonus room insulation
Vents along underside of roof
The gap in the exterior wall of the sunroom has been fixed, and the master closet door opening has been reframed to the correct size.
Gap in sunroom has been repaired
Doorway from master bath into closet has been narrowed