The framing crew is basically stuck until the trusses for the second floor are delivered. All of the first floor walls are up, and the staircase is in place, but the crane operator is off for a long holiday weekend and won’t be available until Wednesday.
Month: June 2017
June 28–Incomplete skeleton
June 27–Some assembly required
This will truly be a stick-built house. They spent all day measuring and cutting all the pieces needed to assemble your house. Middle pieces are all neatly stacked and labeled, and edge pieces are laid out in their proper places.
June 21-Floored
The framing crew worked hard and got the sub-floor laid before the incoming tropical storm. AdvanTech won’t even blink at 3″ of rain.
June 12–Dirt work
They brought in trucks full of dirt and gravel to do the preliminary grading on your lot. The driveway is nearly flat, and slopes just slightly from right to left. The front yard on the guest bedroom side slopes steeply down from the sidewalk/driveway.
June 8–French drain and crawlspace pad
June 7–Waterproofing
June 6–More foundation work

After the weekend and more than 1.5 inches of rain, the crew was able to finish laying the foundation today.